10.5/0.69kV 4000kVA Integrated PCS & Step-up Transformer Cabinet for Energy Storage Projects
This 4000kVA energy storage converter & step-up integrated machine is tailor-made for 3.75MW/15MWh energy storage stations.
This 4000kVA energy storage converter & step-up integrated machine is tailor-made for 3.75MW/15MWh energy storage stations.
ChinaUnita supplies S11-630kVA 10kV oil immersed transformers with full copper winding, factory direct sale, fast delivery.
SCB18-1000kVA Class 1 efficiency box substation designed for heavy truck charging stations. Full copper dry transformer, integrated cabinet, support 320kW DC fast chargers with long service life.
Looking for safe, energy-saving 10kV dry-type transformers for factories and industrial parks? SCB13 & SCB14 high-efficiency units with full copper windings support customized industrial power distribution solutions.
Centralized energy storage PCS booster integrated unit, prefabricated skid-mounted design, integrated PCS, step-up transformer, high voltage cabinet, fire protection & environmental monitoring, supporting AC 6kV~35kV grid connection, ideal for utility-scale energy storage stations in Kazakhstan, Uzbekistan and Central Asia.
SCB14 epoxy cast dry transformer with all-copper winding, Grade 2 energy efficiency compliant with GB 20052-2024, low loss flameproof customizable equipment for Central Asia factory, data center, photovoltaic energy storage and municipal indoor power projects.
SCB11-1000kVA 10kV epoxy cast all-copper dry type transformer, flameproof low noise maintenance-free design, factory direct supply for Central Asia factory, commercial building and indoor substation power distribution.
Custom 35kV American integrated box substation for 100MW mountain photovoltaic energy storage projects, compact structure, high temperature resistance, low construction cost, ideal for complex mountain terrain PV grid connection.
SCB12-800kVA 10kV epoxy cast dry type transformer, copper foil winding, low noise fireproof design, optional forced air cooling for Central Asia indoor factory, mine and commercial power distribution projects.
If you are undertaking rural grid renovation, wind power or mining power projects in Kazakhstan, fill in the form below. Our professional electrical engineers will match exclusive technical parameters and send you a targeted quotation within 24 hours.