Below are factory direct FOB Shanghai prices (USD/unit) for oil immersed & dry type transformers targeting Uzbekistan projects (11kV/0.4kV, IEC/GOST compliant, copper winding, standard design, excluding customization, logistics & customs).

Oil Immersed Transformer Price List (11kV/0.4kV, Three-Phase)

Capacity (kVA)FOB Shanghai (USD)Notes
1001,100–1,300Hermetically sealed, S13 low loss
2001,400–1,600Standard for rural electrification
3151,700–1,900Popular for small industry
5002,100–2,400Mining & construction common
6302,500–2,800Grid & industrial parks
8002,900–3,200Medium industrial projects
1,0003,400–3,800Power distribution hubs
1,6004,500–5,000Large industrial use
2,0005,200–5,700Grid upgrading projects
3,1507,000–7,800Renewable energy (solar/wind)
5,00010,500–11,800Mining & heavy industry
6,30012,800–14,200National grid projects

Dry Type Transformer Price List (11kV/0.4kV, Cast Resin)

Capacity (kVA)FOB Shanghai (USD)Notes
1001,800–2,000Indoor, fire-safe
2002,200–2,500Commercial buildings
3152,700–3,000Urban infrastructure
5003,300–3,700Industrial indoor use
6303,900–4,300High-rise & data centers
1,0005,500–6,000Large indoor projects
1,6007,800–8,500Factory power supply
2,0009,200–10,000Urban grid substations

Key Price Influencing Factors for Uzbekistan Market

  1. Voltage Level
    • 33kV models: +25%–35% vs 11kV same capacity
    • Special step-up/step-down ratios: +10%–20%
  2. Material Choice
    • Copper winding: standard (above prices)
    • Aluminum winding: -30%–40% (lower efficiency)
    • High-grade silicon steel (low loss): +15%–25%
  3. Customization & Standards
    • GOST/Uzbekistan Grid Code compliance: +5%–10%
    • Wide temperature adaptation (-25°C to +50°C): +8%–15%
    • Dustproof/anti-corrosion for mining: +10%–20%
    • Online monitoring (temperature, oil level): +15%–25%
  4. Order Quantity
    • MOQ 1 unit: above list price
    • Bulk order (≥5 units): -5%–10%
    • Government tender (≥20 units): -10%–15%
  5. Logistics to Uzbekistan
    • Sea+rail to Tashkent: ~$150–$300/unit (100–630kVA)
    • Door-to-door delivery: +$300–$800/unit (varies by capacity)

Jiangsu Unita Factory Direct Advantages

  • No middleman markup: Direct factory pricing, 10%–20% lower than traders
  • Flexible MOQ: Accept 1 unit for small projects, bulk for tenders
  • Fast delivery: 15–25 days production, 20–30 days to Tashkent
  • Full documentation: Customs clearance, IEC/GOST certificates for Uzbekistan
  • After-sales: Technical support for installation & commissioning in Uzbekistan